- varnish trim
I *think* but am not sure, that we've now got everything we need final coated.
- install wood floors on upper level and... (all done except for some little strips that need to be ripped for the edges)
- ...down stairs to main level
- install trim on
- hang laundry room pocket door (maybe not necessary before move-in)
- caulk the bathtub
- build bathroom shelves
- install bathroom mirror (which, as Matt's pointing out, is more like design/buy/build/install bathroom mirror)
- install closet rod
- build doors for the low closet (Maybe. We may just hang fabric on a tension rod.)
- ...finish opening between old and new
- install laundry sink (nearly done, but there is a minor leak and I'm not sure if its resolved, so won't cross it off until I'm certain)
- install handrail (Reu and Rin helped me purchase these, and we've got the first coat of varnish on)
And I have photos to share, but won't get them up until tomorrow most likely.
Even more significant, we have a moving date!!! In just over two weeks a small moving crew will show up at Matt's mom's and bring her things over here. Hiring movers accomplishes two things: first, it means the date is solid and won't tend to float, and secondly, it means that Matt doesn't have to wrestle her piano up the stairs!!
"Dew" thinks he's sanding with Dad |
Owen nails on window trim in the laundry room |
Window trim at the stairs, tying into the trim band that separates the two wall colors in the stair well and runs at the top of the larger shelf. |
Wood floors complete in the front room (with the exception of a tiny strip by the wall that needs to be ripped to size.) |
The hallway at the top of the stairs is finished up to the nosing of the first stair. Stairs will be a whole new learning curve. ;) |
Look! Stacked washer and dryer! (And the blue iPad in the doorway so we can monitor Reuben. He's always in the pictures one way or another, it seems!) |
No comments:
Post a Comment