Yes! Done!
- ...down stairs to main level (started! Stringers: 100%. Risers: 75%. Runs and landing: 50%. Nosings: 0%)
- install trim on
- hang laundry room pocket door (maybe not necessary before move-in)
- caulk the bathtub
- build bathroom shelves
- install bathroom mirror (which, as Matt's pointing out, is more like
Took the whole evening, but we got this started tonight! Sometimes the brain work is just as tough as the physical work.
- install closet rod
- build doors for the low closet (Maybe. We may just hang fabric on a tension rod.)
- ...finish opening between old and new
- install handrail (Reu and Rin helped me purchase these, and Matt got the last coat of varnish on tonight)
And, of course, I could write a whole new list of things that are arising as we go. Things including, but certainly not limited to:
- hang window shades
- patch and repaint all of the places where we banged up the walls. ;)
- install vent cover for the Venmar in Barb's bedroom
- find and install a "Determined Bulgarian" proof gate for the stairs going down to the office/entry landing.
- cut, varnish, install access hatch for Barb's bathroom
- cut, varnish, and install back panel of laundry access hatch (since Reuben thinks that's really cool now that the washer and dryer are in. We found some "treasures" in the dryer vent when we hooked up the ducting! and we needed to get it closed off.)
now you see the back of the washer/dryer from the living room side... |
...and now you don't! |