Matt's got a lighter work-work load this week, so there's extra time to get house-work!
Today he was out there this afternoon, and this evening he and I were able to go out there together. We didn't do anything that actually gets an item crossed off
The List, but were able to move forward varnishing of window jambs and installing some window and door trim. (If anyone's tracking, these are items #3, 7, and 8.)
|
Bedroom windows fully trimmed out |
|
Front sitting room (a.k.a. "woodshop" these days!) windows all trimmed out |
|
And door trim on the inside of the bathroom, since the floor is already in on that side. |
No comments:
Post a Comment