Saturday, December 31, 2016

Dad's project

Matt spent much of the day down in the basement bedroom, with the following results:
Look - no temporary wall! And the kitchen is still upstairs where it belongs.

Up near the ceiling on the back wall you can see the controls for the well. That will be covered with a panel, and the space underneath will become a shelf for books and Legos.

And this is the framing for the soffit to cover the duct work that comes below the joists in part of the room. One of the definite downsides of a lower level bedroom. But Matt's made it as low profile as he can, and as cohesive as he can.
Tomorrow he hopes to finish up the framing! It's really a shot in the dark if it will be ready enough when the girls come home. It won't be *done* - we can pretty much guarantee that. But we're still holding out hope that it will be done enough that we can move the boys' beds into it! Because Bogomila's going to have a bedroom to come home to, and NOT the couch in the living room.

No comments:

Post a Comment