I realized I never got around to posting the progress from Monday, so here's a post-dated post with photos...
pretty neat concrete conveyor with a chute to dump the concrete right where they want it |
Matt was right down in there helping the guys (he's the bald one ;) in the white shirt). Owen was watching. |
Footings minus form work plus gravel plus space around the perimeter shoveled out (by Matt) to receive drain tile (by Matt) |
No comments:
Post a Comment